Short answer. Electronic voucher management system disaster recovery is not one uptime number. Each component of the EVMS gets its own recovery point and recovery time. The voucher vault and the dealer wallet ledger must not lose anything that was committed, so they replicate synchronously or with a confirmed write. The channel gateway has to come back first, because dealers stop selling the moment it goes. Reporting can lag behind. A top-up that was in flight when the site failed is treated as unknown rather than failed, and it is settled from the charging records before the dealer’s float is released.
Most RFPs we answer ask for “99.99% availability” and stop there. That figure is fine as far as it goes. It says how much of the year the platform should be up, and nothing about what you get back after the bad hour: whether a dealer’s balance is right, whether a PIN that was revealed on a POS is still marked available, or whether a recharge that timed out during the switch was credited twice.
This is the version we walk operators through in design reviews. Nothing exotic. It assumes the component layout in our EVMS architecture guide, which splits the platform into a vault, an inventory engine, a dealer ledger, a channel gateway, a charging adapter, a reconciliation engine and an audit store.
RPO and RTO in electronic voucher management system disaster recovery
Recovery point objective (RPO) is how much committed data you can afford to lose. Recovery time objective (RTO) is how long a function can stay down. In a voucher platform the answer changes box by box. The table below sets the two side by side for each component of the platform.
| Component | RPO principle | RTO target (illustrative) | Why |
|---|---|---|---|
| Voucher vault | No committed data lost | 15 to 30 min | A lost “sold” flag means a PIN can be revealed twice, and then two customers hold one voucher. |
| Inventory and lifecycle engine | No committed data lost | 15 to 30 min | Status must agree with the vault. If the two disagree after failover, sales freeze on the affected batches until they match. |
| Dealer wallet and credit ledger | No committed data lost | 15 min | Every debit has a cash value, and a balance that rolls back by ten minutes becomes a finance incident. |
| Channel gateway (Android POS, retailer app, web portal, USSD/SMS, partner API) | Session state can be lost | 5 min | Dealers notice within seconds. Terminals re-authenticate, and no money is held here. |
| Charging adapter | In-flight calls become unknown | 5 to 10 min | It holds no balances, but the calls it had open still need settling. |
| Reconciliation engine | Hours (rebuildable) | Next business morning | It recomputes from the ledgers and charging files. |
| Reporting / analytics | Hours | Same day | A stale dashboard stops nobody from selling. |
The RTO figures are illustrative ranges from design discussions, not a commitment for any specific deployment. Your operator’s regulator, contracts and charging platform set the real numbers.
Written down, the pattern is plain. Value and PIN status get zero data loss. The gateway and the adapter only move traffic, so what they need is a quick restart, and the reconciliation and reporting layers get rebuilt later from the ledgers that survived.
High availability and disaster recovery are different jobs
People mix these two up in almost every RFP we read. High availability (HA) is about losing one server, one disk or one process and carrying on. Disaster recovery (DR) is about losing the whole site, the cloud region or the network path to it, and coming back somewhere else.
Inside one site, HA usually means clustered application nodes behind a load balancer and a database pair with automatic failover. Done properly, the dealers never hear about it, because their terminals keep getting answers from the surviving nodes.
DR needs a second site. On voucher platforms we keep meeting the same two layouts:
- Active/standby. The second site receives replicated data and sits warm. Failover is a decision a person makes, ideally from a runbook, and it takes minutes. We see this layout most on voucher platforms because it keeps the ledger simple, with one writer at a time.
- Active/active. Both sites take traffic. Recovery is faster. The price is that you now have to solve concurrent writes to the same dealer wallet from two places. Unless the database gives you a single consistent ledger across sites, running the ledger active/active adds more risk than it removes. For the gateway and reporting it is easier and usually worth doing.
If a vendor quotes “active/active” at you, ask which components they mean, since the honest answer is very rarely all of them.
What happens to a top-up that is in flight during failover
This is where a DR design either holds up or turns out to be a slide.
Take a retailer keying in a 50-unit recharge (illustrative) just as the primary site drops. By then the gateway has taken the money out of the dealer’s float and the charging adapter has fired the request at the operator’s IN or OCS. The link dies before any reply comes back. Did the subscriber get the credit? Nobody can say yet, and the platform must not guess.
On the DR side, three things have to happen in order:
- The transaction comes up as unknown. It is neither failed nor successful, and the float stays reserved. This is the same rule as for an ordinary timeout, which our post on airtime top-up timeouts and unknown status explains.
- The retailer is told not to resell. The POS shows “pending, do not retry”, since a second attempt with a fresh reference is how a subscriber gets credited twice.
- Settlement follows the charging side’s record. The DR site queries status with the original reference, or waits for the charging CDR file, and then completes or reverses the sale. Only after that is the float released or the sale finalised.
One failover can strand a lot of these at once, so we size the exception queue for a backlog well beyond a normal day’s timeouts. On the day-close report they get a line of their own. Finance then reads a DR backlog as a DR backlog and not as a leak. Our reconciliation and PIN security post lists the categories we use, with sales matched against the operator’s redemption records.
PIN stock and the vault during a failover
The second trap is the revealed-but-unconfirmed PIN. A POS asks for a PIN, the vault releases it, and the site dies before the “sold” status is confirmed back to the vault, so the record shows a PIN that left but never sold.
Our rule for those PINs: if the vault let it out during the failover window, it is sold-pending until proven otherwise, and it does not go back into available stock on its own. It goes on an exception list with serial, terminal ID and time. Somebody then looks for a redemption on the charging platform before deciding. Auto-returning it would save one voucher and buy you a duplicate-PIN complaint.
Keys need the same care as data. Each batch secret is wrapped by a master secret held in an HSM, so if the HSM at the DR site does not hold the current master secret, the replicated vault cannot be read. Test that the second site can unwrap those secrets, and do it as part of the drill, as well as checking database replication.
Offline POS buys time but creates a sync queue
Terminals that can sell from a small pre-loaded PIN allocation keep retailers trading through a short outage, which matters in markets with patchy coverage.
The cost comes later. After recovery every terminal uploads its offline sales at once, so the sync has to be idempotent: each offline sale carries a terminal-generated reference, and uploading it a second time changes nothing. It also has to check each PIN against any batch that was blocked during the outage. If a PIN was sold offline from a batch frozen for fraud ten minutes earlier, that sale goes for review, and the retailer’s cash is not rejected automatically.
Drills: a DR plan nobody has run is a theory
We push for at least two failover rehearsals a year, one planned and one at short notice, with the operator’s charging team on the call. Each drill checks the following, and the results go into a written report:
- time from decision to first successful sale on the DR site
- dealer balances on both sides agree to the last transaction
- the in-flight unknowns from the moment of switch were all settled, and how long that took
- PINs released in the window were all accounted for
- terminals re-authenticated without a field visit
- the day-close report the morning after reads cleanly
Write the results down, including what went wrong. In one rehearsal (anonymised, figures illustrative) the platform switched in about twelve minutes, yet around 40 terminals on an old app version kept pointing at the primary address and sat idle until a forced update went out. That lesson was about terminal management rather than databases. Our migration playbook applies the same rehearsal logic to cutovers.
Questions to put in the RFP
Comparing vendors? These questions get past the uptime number. We’d use them next to the checklist in how to choose an electronic voucher management system, which covers the rest of the RFP.
- State RPO and RTO for the vault, the ledger, the gateway and reporting separately.
- Which components run active/active, and how are concurrent writes to one dealer wallet prevented?
- How are charging calls in flight at failover handled, and who settles them?
- What happens to PINs released but not confirmed at the moment of failure?
- Where are encryption keys held at the DR site, and how is that tested?
- How do terminals find the DR site, and what happens to those that do not?
- Provide the report from your most recent failover drill (anonymised is fine).
A vendor who answers all seven in writing has probably run a real failover. One who repeats the SLA percentage probably has not.
Where MoboGage EVD System fits
MoboGage EVD System is an electronic voucher management system built around the split described above. The vault and ledger form the core that must lose nothing, the gateway and reporting form the edge that has to recover fast, and unknown-status settlement runs as a normal path rather than an emergency procedure. Hosting model, second-site layout and charging connectivity are scoped per project with the operator, because they depend on the operator’s own data-residency rules and charging platform. If you are writing an RFP, contact the team at projects@mobogage.com.
FAQ
What is disaster recovery in an electronic voucher management system?
It is the plan and the second-site setup that bring voucher sales, dealer balances and PIN stock back after a full site or region failure, with defined limits on how much data can be lost (RPO) and how long each function can be down (RTO).
Is 99.99% availability enough for a voucher platform?
As an uptime target, yes. It does not tell you whether balances and PIN status survive a failure, though. Ask for RPO and RTO per component as well, and expect the vault and dealer ledger to lose no committed data.
Should an EVMS run active/active across two sites?
Yes for the channel gateway and reporting, where it is a common choice. The dealer ledger is different: run it active/active only when the database guarantees one consistent ledger across both sites. For the parts that hold money, active/standby with zero-loss replication is the more common and simpler choice.
What happens to a recharge that was in progress when the platform failed over?
It is marked unknown, the dealer’s float stays reserved, the retailer is told not to retry, and the outcome is settled from the charging platform’s status query or CDRs using the original reference.
How often should operators test EVMS failover?
Twice a year at minimum. Bring the charging team into the drill, and write a report afterwards that covers balances, in-flight transactions, released PINs and terminal reconnection.